GLOBAL Alert Overide

Vight condensed lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergr sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consedipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.

Skip to main content

Minor Project/Construction Request

Semmy Ju, Director

Please be advised that the Minor Project/Construction Request procedure issued on June 30, 1997 has been revised. Attached for your use is a copy of the revised procedure that reflects the inclusion of the following changes in university rules and regulations.

  • The name of the form has been changed from “Minor Project/Construction Permit” to “Minor Project/Construction Request” to avoid confusion between this procedure and the Building Code Permit and Inspection Program recently established by Environmental Health and Safety Division.
  • The maximum for minor project construction has been changed from $500,000 to $1,000,000.
  • Projects including classroom facilities require signature approval by Office of Instructional Resources.

Your careful attention to this revised procedure is appreciated. If you have any questions, please contact the Campus Planning and Construction Management Division at 392-1256.

UF Minor Project/Construction Request Instructions (6 KB)
UF Minor Project/Construction Request (10 KB)
( Acrobat(R)Reader required )