GLOBAL Alert Overide

Vight condensed lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergr sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consedipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.

Skip to main content

Construction/Renovation Estimate Service Charge

David S. O’Brien, Director, Physical Plant Division

One of the services provided by the Physical Plant Division is to provide an estimate to colleges/departments that are contemplating minor construction/renovation to their facility. Usually these projects do not exceed $50,000. Unfortunately, over 85% of these estimates are never funded by the requesting college/department.

Effective immediately, colleges/departments requesting an estimate for proposed minor construction/renovation will be required to pay a fixed charge of $100 per estimate or 10% of the project estimate (whichever is lowest). Additionally, each revision to the original estimate will cost the requestor $50. All estimate charges will be credited if the project is funded within 90 days.